Standard Procedure

All our installation teams are trained to a high standard. To maintain a high standard of workmanship we issue our Standard Design Procedures. These are procedures for situations that may arise on site for Reeve-Tec Membranes technicians.

Should you be interested in viewing the complete document containing the details below, please contact us on 01767 677405 or email info@reevetecmembranes.co.uk.

STANDARD WORKING DESIGN DETAILS AND PROCEDURES
INDEX

1.0 Corners
1.1 Internal – In Situ
1.2 External – In Situ
1.3 Combined (housing)
1.4 Folded – In Situ
1.5 Prefabricated Interior and Butyl Tape
1.6 Prefabricated Exterior
1.7 Munched Corner

2.0 Joints
2.1 Welded – Dem-Tech Pro-Wedge
2.2 Leister – Fusion
2.3 Lap Extrusion (Munch)
2.4 Twinny – Fusion
2.5 Weld Preparation
2.6 Twinny Welding
2.7 Butyl Tape

3.0 Penetrations
3.1 Service Pipe – Straight – Top Hat
3.2 Service Pipe – Self Adhesive
3.3 Service Pipe – Collar Top Hat & Self Adhesive
3.4 Periscope Vent
3.5 Periscope Vents
3.6 Service Pipe – Pipe angled
3.7 20mm Penetration Starter
3.8 20mm Penetration pipe/Drainage hanger
3.9 Threshold – stepped membrane
3.10 Wind Posts/Door Posts

4.0 Columns/Encasements
4.1 Steel 1 Sections
4.2 Concrete Circular Sections
4.3 Concrete Rectangular Sections

5.0 piles and Pits
5.1 Driven Piles
5.2 CFA piles
5.3 Lift Pit – Internal Wrapping
5.4 Lift Pit – External Wrapping

6.0 Accessories and Machinery
6.1 P.S. Hooks
6.2 Battens
6.3 Manhole Lids
6.4 Adhering to brickwork and concrete
6.5 Movement Joints

7.0 Repairs
7.1 Welded Leistered
7.2 Butyl Tape
7.3 Self-Adhesive
7.4 Munch

8.0 Containment
8.1 Bundle Positioning
8.2 Anchor Trench Detail
8.3 Concrete Structures and pipes
8.4 Twinny Welding
8.5 Corner Folding to Sheets

Leave a Comment